0vehicles reporting, connecting to the operator feed
3 active alerts affecting this line
Starting Friday, November 6 at 7 p.m. through Monday, November 9 at 5 a.m., there will be various lane closures on 4 Street N.W. between 19 Avenue N.W. and 20 Avenue N.W. for utility tie-in. Route 2 will have a stop closure. The following stop will be temporarily closed: SB 4 ST N.W. @ 19 AV N.W. (#4857) Please use the following stops in lieu of the closed stops: SB 4 ST N.W. @ 18 AV N.W. - farside temporary stop
Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 2 & 4 will have a stop closure. The following stop will be temporarily closed: WB 6 AV SW @ 1 ST SW (#5115) Please use one of the following stops in lieu of the closed stop: Route 2: SB Centre ST S @ 4 AV S (#6669) WB 6 AV SW @ 2 ST SW (#5118
Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 2 & 4 will have a stop closure. The following stop will be temporarily closed: WB 6 AV SW @ 1 ST SW (#5115) Please use one of the following stops in lieu of the closed stop: Route 2: SB Centre ST S @ 4 AV S (#6669) WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop) Route 4: WB 6 AV SE @ 1 ST SE (#7466) WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
Starting Friday, November 6 at 7 p.m. through Saturday, November 7 at 2 p.m., there will be various lane closures on 4 Street N.W. between 19 Avenue N.W. and 20 Avenue N.W. for utility tie-in. Route 2 will be detoured. Southbound route 2 will travel: From South 4 Street N.W. West on 20 Avenue N.W. South on 5 Street N.W. East on 18 Avenue N.W. South on 4 Street N.W., to regular route