3vehicles reporting, refreshed every minute
In service
Vehicle 1823Position 70s ago
In service
Vehicle 1840Position 65s ago
In service
Vehicle 184229 km/hPosition 52s ago
7 active alerts affecting this line
South Station Escalator 388 (Lobby to CSA area) is unavailable due to maintenance.
Back Bay Elevator 854 (Commuter Rail track 2 to lobby) is unavailable.
To exit, exit the train at Ruggles or Forest Hills, then take an Oak Grove-bound train to Back Bay and use Back Bay Elevator 853. To board the Commuter Rail, use Back Bay Elevator 853 to access the Orange Line platform, then take a Forest Hills-bound train to Ruggles or Forest Hills and transfer to the Commuter Rail. Alternatively, board or exit Commuter Rail trains at South Station. Please see station personnel or a train conductor for assistance. In addition, check the Commuter Rail train schedules for train arrival/departure times at Ruggles and Forest Hills by visiting mbta.com/schedules.
Recent service status changes, newest first.
Franklin Line Train 7014 (8:10 AM from Forge Park/495) is operating 5-15 minutes behind schedule between Norfolk and South Station due to slippery rail conditions.
Affected stations: Norfolk Walpole Foxboro Windsor Gardens Norwood Central Norwood Depot Islington Dedham Corporate Center Endicott Readville Fairmount Blue Hill Avenue Morton Street Talbot Avenue Four Corners/Geneva Uphams Corner Newmarket Forest Hills Ruggles Back Bay South Station
On Fri, Nov 6 and Mon, Nov 9, shuttle busses will replace Foxboro Line service between Foxboro and Walpole for a connection with scheduled Franklin Line trains.
South Station Escalator 420 (Alewife platform to South Station platform) is unavailable due to maintenance.
From late August through late November, 2026, South Station restrooms will be under construction. Temporary restroom facilities have been positioned along Atlantic Ave.
Affected lines: Fairmount Line Fall River/New Bedford Line Framingham/Worcester Line Franklin/Foxboro Line Greenbush Line Kingston Line Needham Line Providence/Stoughton Line
The Endicott Mini-high platform project has begun. Passengers and local residents can expect pedestrian path changes to platform, construction vehicles, and construction activity during the day through the Winter of 2026.
Affected lines: Franklin/Foxboro Line